PRG Bad Boy Field Service Manual User Manual

Page 71

Advertising
background image

BAD BOY

®

SPOT LUMINAIRE FIELD SERVICE MANUAL

63

CAUTION:

The Main Head Fan has been upgraded. Be sure to install

only

the latest hi-temp fan. The hi-

temp fan can be identified by a red ring around the spinner.

Note: In order to prevent heat from escaping the rear bulkhead area and moving into the main head assembly,
aluminum tape has been used to seal the backcap perimeter, fan wire hole, and back side of pinch fan. Re-apply new
tape before re-installing the Aft Cover. Refer to technical bulletin BAD-002 for more information.

Step

8. Replace Main Head Fan by doing steps in reverse.

Be sure to re-apply aluminum sealing tape as noted

above.

Advertising