Replacing the Interface/LVS Module

Parts:

23.9812.0812

1 EA

ASSY, INTERFACE/LVS MODULE

Tools:

#2 Philips screwdriver

WARNING:

Remove power from luminaire before performing any maintenance procedures.

To replace the Interface/LVS Module:

Step

1. Remove power from luminaire and allow components to cool for at least 5 minutes.

Step

2. Remove Intake Cover. (Refer to

"Removing the Enclosure Covers"

on page 32.)

Step

3. At Interface/LVS Module, remove four 10-32 x 3/8" PPB SEMS screws (Figure 3-35).

Step

4. At left side of Interface/LVS Module, disconnect the following wiring:

a.

Fan cable.

b.

APS Control Line cable.

c.

Neutral (white) cable.

d.

Line (black) cable.

e.

Ground cable.

Step

5. At right side of Interface/LVS Module, disconnect the following wiring:

a.

Fan cable.

b.

CAN Bus cable.

c.

Power cables (red and black).

Step

6. Remove Interface/LVS Module from enclosure.

Note: The battery pack cable is intentionally NOT connected. Do not re-connect.

Step

7. Replace Interface/LVS Module by doing steps in reverse.

Do not connect battery pack cable. Leave this