Replacing the tilt drive assembly – PRG Bad Boy Field Service Manual User Manual

Page 90

Advertising
background image

82

BAD BOY

®

SPOT LUMINAIRE FIELD SERVICE MANUAL

Replacing the Tilt Drive Assembly

Parts:

21.9812.0719

1 EA

ASSY, TILT DRIVE

Tools:

#2 Philips screwdriver
7/16" open-ended wrench
3/8" Nutdriver
Sonic Tension Meter, Model 507C (07.3082.1052.0)

WARNING:

Remove power from luminaire before performing any maintenance procedures.

To replace the Tilt Drive Assembly:

Step

1. Remove power from luminaire and allow components to cool for at least 5 minutes.

Step

2. Remove both Yoke Covers by loosening four captive screws (Figure 3-39).

Step

3. At Tilt-Side Yoke Leg, remove Yoke Handle by removing two 10-32 x 5/8" PFZ screws (Figure 3-42).

Figure 3-42: Removing Tilt Drive Assembly

Yoke Handle

10-32 x 5/8"
PFZ Screw (2)

Tilt Drive Assembly

10-32 Nylon

Tilt Pulley

Belt

#10 Flat Washer (4)

Insert Nut (4)

Advertising