6 operation, 1 initial start-up, 2 installation of accessories – Martin Christ Epsilon 2-10D LSCplus User Manual

Page 43: 3 preparation, 4 switching the freeze-dryer on

Advertising
background image

Freeze-dryer EPSILON 2-10D LSCplus

6 Operation

Version 04/2013, Rev. 1.5 of 16/12/2014 • sb

43

Translation of the original operating manual

Pos: 129 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 B etrie b= === == == === == == === == == === == == == === == == == @ 25\ mod _14 049 837 597 58_6 8.d ocx @ 183 578 @ 1 @ 1

6 Operation

Pos: 130 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 -00 10 E rste I nbe trie bnah me ++ +++ ++ ++ +++ ++ ++ +++ ++ ++ ++ + @ 2 5\m od_ 140 4983 760 674 _68. docx @ 18 359 2 @ 2 @ 1

6.1 Initial start-up

WARNING

Before the initial start-up, please ensure that your freeze-dryer is properly
set up and installed (see chapter 5 - "Set-up and connection")

Pos: 131 /01 0 Univ ersal mod ule/L eerz eile @ 0\m od_ 120 211 624 450 0_0. docx @ 11 4 @ @ 1

Pos: 132 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 -00 20 Install ation von Zu behö rko mpo nent en +++ ++ ++ +++ ++ ++ +++ ++ ++ + @ 25\m od_ 140 498 376 184 0_68 .docx @ 1 836 07 @ 2 @ 1

6.2 Installation of accessories

The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
The installation instructions can be found in a separate document. Please
contact our sales department if you have any queries.

Pos: 133 /01 0 Univ ersal mod ule/L eerz eile @ 0\m od_ 120 211 624 450 0_0. docx @ 11 4 @ @ 1

Pos: 134 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 -00 30 V orb ereit ung ++ +++ ++ ++ +++ ++ ++ +++ ++ ++ ++ +++ ++ ++ ++ @ 25\ mod _14 049 837 628 63_ 68.d ocx @ 183 620 @ 2 @ 1

6.3 Preparation

The ice condenser chamber must be clean and dry.
• Remove any water residues from the preceding run.
• Close the media drain valve and the aeration valve.
• Ensure that all of the valves of the accessories are closed.
• Switch the vacuum pump on.

Pos: 135 /01 0 Univ ersal mod ule/L eerz eile @ 0\m od_ 120 211 624 450 0_0. docx @ 11 4 @ @ 1

Pos: 136 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 -00 40 Ein schalt en (Haup t- u nd N etzsch alter ) + ++ ++ +++ ++ ++ +++ ++ ++ +++ ++ ++ ++ +++ ++ ++ +++ @ 2 5\m od_1 404 983 763 907 _68. docx @ 18 363 4 @ 2 @ 1

6.4 Switching the freeze-dryer on

NOTE

The freeze-dryer is equipped with a main switch and a mains power switch
(see chapter 2.1.1 - ""). The main switch establishes the mains power
supply and the mains power switch supplies the control system of the
freeze-dryer with power.


• Actuate the main switch
• Actuate the mains power switch.
The LSCplus control unit performs a self-test and an initialisation. This may
take several seconds.

• Follow the safety instructions and hazard warnings (see chapter 3 -

"Safety")!

Pos: 137 /01 0 Univ ersal mod ule/Seit enwec hsel @ 0\m od_ 120 211 624 4312 _0. docx @ 10 5 @ @ 1

Advertising