Operation, Operation • 2 – Pitney Bowes DI425 FastPac Inserting Systems User Manual

Page 17

Advertising
background image

Operation • 2

2-1

SV61656 Rev. A

About this Chapter

This chapter explains operation of the machine, assuming the job

you want to run is already programmed into the system.
If you haven’t programmed the job, please go to Programmng Jobs

on page 2-9.

Connecting Power

IMPORTANT! Read the safety information on

pages 1-1 and 1-2 of this guide before you

connect the machine.

Connect the power cord to the socket on the left side of the machine.
Plug the power cord into a suitable power outlet. Make sure the pow-

er outlet is near the machine and

is easily accessible.
Turn the power switch ON.

Advertising