Basler Electric BE1-11 IEC 61850 Protocol User Manual
Page 40
Advertising
34
9424200892 Rev F
Figure 33. Report Controls Tab
Figure 34. Add New Report Control Screen
Step 4: Make the appropriate settings as shown in Table 10 and click the Add button.
Step 5: Right-click on the BE1_11_1 file in the Workspace and select Validate. The round indicator
located on the left side of the file name changes from yellow to green if validation is successful.
Step 6: Repeat Steps 1 through 5 to configure additional Report Control Blocks.
BEST61850™
BE1-11