Seaward 350 PrimeTest User Manual

Page 101

Advertising
background image

PrimeTest 350 Operating

Instructions

- 100 -

15.7 Load

Measurement


Load current is measured during the 2 powered tests
only. The load in kVA is calculated from incoming
mains voltage and the load current.

Load Display Range

0 – 4.00kVA

Load

Resolution 0.01kVA

Load

Accuracy

±

10%

±5

digits

15.8 Earth Loop Resistance


Test Voltage

Mains supply 230V +10% / -15%

Test Current

Non-trip for 30mA RCD

Test

Duration Approx

10

seconds

Pass/Fail

Limit

User

Defined

Display

Ranges

0.0

199

Ÿ

Measuring Range

1.0 – 199

Ÿ

Resolution 0.1

Ÿ, 0.0 – 19.9Ÿ

1

Ÿ, 20 – 199Ÿ

Accuracy

±

10%

±2

digits

15.9 RCD Trip Time


Test Voltage

Mains supply 230V +10% / -15%

Test Current

30mA rms sinusoidal

Test

Duration 2000ms

max

Pass/Fail

Limit

None

Display

Range

0

2000ms

Measuring Range

20 – 2000ms

Resolution

1ms

Accuracy

±

10%

15.10 IEC Lead Test


This is a 3 part test is made up of:

Earth Continuity – specification as 10.1 above.
Insulation Resistance – specification as 10.2 above.
Wiring Check – checks for:

Live open

Neutral

open

L/N

Short

L/N Reversed

1.2Ω

Advertising