Seaward 350 PrimeTest User Manual

Page 86

Advertising
background image

PrimeTest 350 Operating

Instructions

- 85 -

If the Earth Continuity test results in a Fail and the On
Test Failure
is set to End Test the sequence is
terminated.

Note: On Test Failure is set in User OptionsTest

OptionsOn Test Failure.



If the Earth Continuity test results in a Fail and the On
Test Failure
is set to Fail Menu the display is as
shown below.

The earth continuity test can be restarted by simply
pressing OK (F4) to select Restart Test.

The next test in the sequence for 230V Hand Held or
Portable Class I is an insulation resistance test. The
display is as shown below.

Advertising