Seaward 350 PrimeTest User Manual

Page 82

Advertising
background image

PrimeTest 350 Operating

Instructions

- 81 -


To enter a value, simply move the cursor to the correct
field using the UP/DOWN arrows

Now enter the required number of months and press
Enter (F4) to accept.

The Asset Details are now complete and the
PrimeTest 350 is ready to perform the test.

13.6 Running the test sequence


When the required Asset ID, Site, Location and Test
Period details have been entered, press the OK (F4)
key to initiate the test sequence.

Advertising