Power on/off, 3 power on/off, Power on – Sekonic Speedmaster L-858D-U Light Meter User Manual

Page 19

Advertising
background image

5

2. Before Use

2-3

Power ON/OFF

Power ON

1.

Press the Power Button

5

.

The meter turns on.
The Startup Screen appears on the LCD for

one second.
Then operating assignment for the

Measuring Button

6

(MEASURE) and

Memory Button

7

(MEMORY) are displayed

on the Measuring Screen for two seconds.

Startup Screen

Startup Screen that appears

if a transmitter (sold

separately) is installed

Measuring Screen

Measuring Screen

Power Button

5

Memory Button

7

Measuring Button

6

Advertising