Verifying a successful installation, Erifying a successful installation – HP zl User Manual

Page 27

Advertising
background image

hp toptools for openview nnm

user guide

Figure 3-5. The platform bridge component will finish by displaying the NNM console output.

The final screen will then be displayed indicating that the installation has been successful.


If you integrate new components into your toptools server, such as a new version of HP Toptools for Servers, HP
Web Jetadmin, or Toptools for Hubs and Switches you must uninstall and then reinstall the platform bridge
component in order for these new capabilities to be available in the NNM console.

3.4 Verifying a successful installation


The first way to verify that the bridge has been installed and is functioning properly is to start NNM. The Tools
menu should have a new entry, HP Toptools, which brings up a sub-menu such as the one in Figure 3-6. (Note that if
you have previously uninstalled HP Toptools for OpenView NNM, toptools menu actions may not appear for SNMP
managed devices. To correct this, do a Find Object by Attribute on "isSNMPSupported", select those devices on the
map you wish to update, and then go to Fault->Network Connectivity->Poll Node to update those nodes.)

Page

27

Advertising