State Industries SANDBLASTER SBD85 500 User Manual

Page 11

Advertising
background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

10

GAS PRESSURE REQUIREMENTS

Natural Gas

Propane Gas

Maximum Supply Pressure

10.5" W.C.

13.8" W.C.

Minimum Supply Pressure

5.0" W.C.

11" W.C.

Manifold Pressure

4.0 " W.C.

10" W.C.

The supply gas pressure is normally measured at the dirt leg or at the gas pressure

tapping on the gas supply shutoff valve. This reading must be measured with 'flowing'

gas.

The manifold gas pressure is measured at the manifold pressure tap of the gas valve

when the gas is flowing.

Supply Gas

Dirt Leg

Manifold

Gas Port

Manifold

Pressure

Tap

Advertising