State Industries SANDBLASTER SBD85 500 User Manual
Page 14
Advertising

SBD TANK TYPE HEATERS
SERVICE HANDBOOK
Technical Training Department
Ashland City, TN ©2003
13
Nine Rules for Good Vents (continued)
2. The diameter of a vent pipe should NEVER be
reduced, no matter what the circumstances.
3. In some cases it may be necessary to run a vent larger
than the draft diverter outlet.
4. Take the maximum vertical rise possible immediately
above the draft diverter.
5.
Advertising
See also other documents in the category State Industries Water boiler:
- 505 Interior (4 pages)
- 186589-001 (32 pages)
- Utra-Force STC-077 (46 pages)
- SANDBLASTER CSB 82 (2 pages)
- Premier GPH-90N (60 pages)
- GPV-650A (40 pages)
- Sandblaster SCGSS00407 (2 pages)
- GS675HRVIT (36 pages)
- A B C D E F 100 (44 pages)
- 195115-000 (2 pages)
- GPX (44 pages)
- 196114-000 (16 pages)
- ASME SSE-120 (40 pages)
- ES6/ESX 40 (2 pages)
- ULTRA FORCE 100 (80 pages)
- 317913-000 (16 pages)
- ROOFTOP SRT80 120NE (36 pages)
- 5 THRU 120 (4 pages)
- 198067-000 (8 pages)
- GS6/GSX 65 YRRT (2 pages)
- GPO 86-199 (24 pages)
- GP6 50 (40 pages)
- Gas-Fired Water Heaters (4 pages)
- CCVIT 200/201 (4 pages)
- Premier Power Vent DV Series GP6 50 YTPDT 120 Series (60 pages)
- Collins (1 page)
- Power Vent/Power Direct Vent Gas Models (44 pages)
- 197425-004 (40 pages)
- Sandblaster SCESS00308 (4 pages)
- Premier Residential Water Heaters (4 pages)
- Residential Gas Water Heater (32 pages)
- Commercial SCGSS00107 (1 page)
- Force 90+ SCGSS01108 (2 pages)
- 184671-000 Rear (2 pages)
- PCE 6-120 (16 pages)
- 201 Series (2 pages)
- PREMIER Residential Electric Water Heaters (2 pages)
- FANUC GFK-0827 (103 pages)
- GSX-50 EN (2 pages)