State Industries SANDBLASTER SBD85 500 User Manual

Page 32

Advertising
background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

31

STEP 11

WIRE HARNESS TEST

STEP 11. WIRE HARNESS TEST. Test for 24 VAC between terminal 24V on the IID

module, and 24V GND.

N

E

H

T

F

I

24 VAC is not present:

• Check the wiring harness.

24 VAC is present:

• Go to step 12.

Note: This test may be easier to conduct by removing the red wire from the IID terminal. Test for 24

VAC between the red wire and ground. Reconnect the red wire to the 24V terminal after the test.

Advertising