State Industries SANDBLASTER SBD85 500 User Manual

Page 39

Advertising
background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

38

STEP 17

IID MODULE TEST

Pilot is lit - Sparking has stopped.

STEP 17. IID MODULE TEST (Power to the Main Valve). Using a multimeter, test for

24 VAC between terminal MV on the IID and 24V (GND).

N

E

H

T

F

I

24 VAC is not present:

• Replace the IID module. Conduct Step

18 before applying power to

replacement module.

24 VAC is present:

• Go to step 18.

Advertising