State Industries SANDBLASTER SBD85 500 User Manual

Page 33

Advertising
background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

32

STEP 12

IID MODULE TEST

STEP 12. IID MODULE TEST (Power to the Pilot Valve). Using a multimeter, test for

24 VAC between terminal PV and 24V (GND) on the IID during the 90 second trial for

ignition.

N

E

H

T

F

I

The meter does not read 24 VAC and the

IID module is not between ignition trials:

• Replace the module.

The meter does read 24 VAC:

• Go to step 13

Advertising