Step 16 flame rectification – State Industries SANDBLASTER SBD85 500 User Manual

Page 38

Advertising
background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

37

STEP 16

FLAME RECTIFICATION

STEP 16. FLAME RECTIFICATION

Note: Flame rectification means that an alternating current (AC) signal is changed to a direct current (DC)

signal. The pilot flame is the 'switch' which connects the pilot hood to the igniter and ground. If the pilot

hood and igniter sensor had the same surface area, the flame 'switch' would conduct an AC signal.

Because the pilot surface is greater than the igniter surface, the signal becomes a DC current that the

module can interpret. The pilot hood must be properly grounded and the pilot flame must remain in contact

with both surfaces for the flame proving signal to remain constant.

If the signal is broken for just 8 tenths of a second, the heater will cycle off.

Sparking at the pilot will continue if an insufficient signal is received by the module.

Sparking at the pilot will stop almost immediately after the ignition module senses the pilot flame.

N

E

H

T

F

I

Sparking continues after pilot is

established:

• Check wire connections

• Check flame contact between hood and

lighter

• Clean pilot burner surfaces

• Replace pilot assembly

Sparking stops:

• Go to step 17.

Advertising