Chapter 2: site preparation, About site preparation, Site preparation overview – Perle Systems 833IS User Manual

Page 27

Advertising
background image

Perle 833IS User Guide

11

Chapter 2: Site Preparation

About Site Preparation

In this chapter you will read about:

Site Preparation Overview

Electrical Requirements

Environmental Requirements

Cabling Planning and Requirements

Telephony Cabling

Site Preparation Overview

The following is a checklist of recommended tasks that should be completed before
installing the 833IS. Some may not apply to your installation, or you may wish to
add new items.

Identify and contact the following individuals:

✎__ Network supplier.

✎__ Remote Installation Planner.

✎__ Cabling supplier.

then,

✎__ Analyze the site's electrical requirements. See “Electrical Requirements”

on page 12.

✎__ Analyze the site's environmental requirements. See “Environmental

Requirements” on page 13.

✎__ Determine the future location of the 833IS that will meet the placement

needs of the unit. See “Placement” on page 13.

Determine your cabling needs for:

✎__ LAN cabling. See “LAN Cabling” on page 14.

✎__ Telephone network cabling. See “Telephony Cabling” on page 19.

Advertising