NCR S26 User Manual

Page 155

Advertising
background image

Installation

NCR S26 Hot Plug Server User Guide

D-15

Figure D-9. Installing the Hot Plug Backplane

5. Connect three power cables into the connectors at the back of the

backplane board.

6. Remove the terminators on each of the SCSI drives that you will install.

7. Position the drive over the hot plug tray and connect the SCSI cable and

power cable.

Advertising