Procedure in the ft server utility, Sample screen of ft server utility – NEC Express 5800/320Lc User Manual
Page 214
Advertising

Installing and Using Utilities 5-51
Procedure in the ft server utility
Perform the procedure below before replacement of a component.
1.
Select the target component by using the ft server utility.
2.
Check the current state of the target component with the LEDs and event log.
3.
Click the [Clear] button in [MTBF Clear] of the target component.
The MTBF clearing result can be confirmed by the LEDs on the target component. The
result of the MTBF clearing operation is registered in the event log.
4.
Start the component.
Sample screen of ft server utility
[PCI Module]
Advertising
This manual is related to the following products: