Burkert Type 2300 User Manual

Page 36

Advertising
background image

36

Maintenance, cleaning

Packing gland

VA spindle guide

Spindle

Packing gland tube

Hexagon

Series
production status
since April 2012

Fig. 31: Replacing packing gland (VA spindle guide)

Packing gland

Spacer

Spindle

Packing gland tube


SP22

VA spindle guide

Fig. 32: Replacing packing gland SP22

WARNING!

Risk of injury from parts jumping out!
When the spindle opening is exposed, the individual parts of the
packing gland are pressed out at an undefined speed when the
pilot air ports is pressurized.
• Before pressurizing with control air, safeguard the ambient area

of the discharge opening (e.g. place spindle on a firm base).

1

2

Pilot air port

Pilot air port

Fig. 33: Connections

Press out packing gland:
Control function A and I Pressurize pilot air port 1 with 6 – 8
bar.
Control function B Pressurize pilot air port 2 with 6 – 8 bar.

Grease the individual parts of the new packing gland with the
upplied lubricant.

Connect the individual parts to the spindle in the specified
direction and sequence (as illustrated in “Fig. 34” or “Fig. 35”).

Push packing gland into the packing gland tube.

english

Type 2300

Advertising