Example of basic e-con positioning sequence – IAI America E-Con User Manual

Page 103

Advertising
background image


89

Appendix


Example of Basic E-Con Positioning Sequence






















































An example of basic sequence is given below for reference when creating an E-Con positioning sequence.

indicates a PIO signal of the E-Con controller.

(Completed position decoding circuit)
Positioning complete

Completed position code

(Not less than the
PLC’s scan time)

Waiting for completed position to be read





Completed position 1



Completed position 2

Completed position 3

Completed position 4

Completed position 5



Homing start pulse


Homing start pulse, auxiliary





Position 1 (home) poisoning start pulse



Position 1 (home) poisoning start pulse, auxiliary






Position 1 (home) poisoning start, auxiliary










Position 1 (home) start confirmation






Position 1 (home) positioning complete

To be created for the number of positions.

(Position 1 positioning circuit: When position 1 is home.)

Homing request

Homing request

Position 1
positioning start
request

Position 1
positioning start
request

Positioning start request signals are sent as pulses so that one start
signal will be sent for each positioning operation.

Homing complete

Current positioning
completed position

Start signal

Moving signal

Next positioning
start auxiliary
signal

Completion of positioning to the command position is confirmed.

Advertising