IAI America SEL-TG User Manual

Page 15

Advertising
background image

Pre-5

No.

Operation

Description

Description

6 Trial

Operation

Ɣ When the work is carried out with 2 or more persons, make it clear who

is to be the leader and who to be the follower(s) and communicate well
with each other to ensure the safety of the workers.

Ɣ After the teaching or programming operation, perform the check

operation one step by one step and then shift to the automatic
operation.

Ɣ When the check operation is to be performed inside the safety

protection fence, perform the check operation using the previously
specified work procedure like the teaching operation.

Ɣ Make sure to perform the programmed operation check at the safety

speed. Failure to do so may result in an accident due to unexpected
motion caused by a program error, etc.

Ɣ Do not touch the terminal block or any of the various setting switches in

the power ON mode. Failure to do so may result in an electric shock or
malfunction.

7 Automatic

Operation

Ɣ Check before starting the automatic operation or rebooting after

operation stop that there is nobody in the safety protection fence.

Ɣ Before starting automatic operation, make sure that all peripheral

equipment is in an automatic-operation-ready state and there is no
alarm indication.

Ɣ Make sure to operate automatic operation start from outside of the

safety protection fence.

Ɣ In the case that there is any abnormal heating, smoke, offensive smell,

or abnormal noise in the product, immediately stop the machine and
turn OFF the power switch. Failure to do so may result in a fire or
damage to the product.

Ɣ When a power failure occurs, turn OFF the power switch. Failure to do

so may cause an injury or damage to the product, due to a sudden
motion of the product in the recovery operation from the power failure.

Advertising
This manual is related to the following products: