Powering up the server – HP Remote Insight Lights-Out Edition II Board User Manual

Page 18

Advertising
background image

Installing the RILOE II 18

Connect the AC power adapter cable as shown.

Powering up the server

1.

Plug the AC main power cord into the server and then into a grounded AC outlet.

WARNING: To reduce the risk of electric shock or damage to the equipment:

Disconnect power from the system by unplugging all power cords from the power

supplies.

Do not disable the power cord grounding plug. The grounding plug is an important

safety feature.

Plug the power cord into a grounded (earthed) electrical outlet that is easily

accessible at all times.

2.

Turn on any peripheral devices attached to the server.

3.

Turn on the server.

Advertising