Site requirements, Installation checklist – IPricot IPR-S1000 User Manual

Page 9

Advertising
background image

Installing the IPR-S1000

4

Protect the equipment

1) Never assume that electrical power is disconnected. Do check it
first.

2) Do a previous check-up of any potential source of danger within
your work environment (wet floor, visible electrical cable...).

3) Always disconnect AC power cable during the installation when
moving the equipment.

3. Site requirements

To assure normal operation and avoid unnecessary maintenance, it is
recommended to prepare your site before installation.

Planning a proper location for the IPR-S1000

1) Place the IPR-S1000 into the desired location. The unit is designed
to be sitting vertically on a plane and clean surface.

2) Keep the product safe from heat, dust and moisture.

3) Make sure the site maintains an ambient temperature of 5° to 45°C.

4. Installation checklist

To assist you with your installation and to provide a historical record of
what was done and by whom, fill in the following IPR-S1000 installation
checklist.

Installation Checklist

Task

Verified

by

Date

Date the IPR-S1000 received

The IPR-S1000 and accessories unpacked

Types and numbers of interfaces verified

Safety recommendations and guidelines
reviewed

Site requirements verified

Advertising