2 base frame covers, Carry deck support frame - installation, 2 base frame covers -2 – JLG 10MSP Service Manual User Manual
Page 34: Carry deck support frame - installation -2, Front cover - installation (carry deck version)
SECTION 3 - BASE COMPONENTS
3-2
– JLG Lift –
3121228
3.2 BASE FRAME COVERS
Front Cover - Installation (Carry Deck Version)
Carry Deck Support Frame - Installation
Above or later design below
Carry Deck - Hood Removal.
1. Hood - Carry Deck
2. Attach Screw
3. Rear Hold-Down Bracket -Located
Under Hood - Slides Under Hood
Support
NOTE: (a) The Carry Deck has a maximum capacity of 250 lb.
(115k).
(b) Unscrew the attach screw to release hood from the
frame mount under the cover. Lift the hood slightly out of
the frame gasket and slide deck forward till the rear hold-
down bracket clears the support frame under the hood.
Then lift to remove deck from machine.
1
3
2
Carry Deck Support Frame Installation
1. Carry Deck Support
2. Support Screws (4-places)
(Apply Loctite #242)
Carry Deck Support Frame Installation
1. Carry Deck Support
2. Support Screws, Nuts, Washers
(2-places)
1
2