Platform junction box - install/remove – JLG 10MSP Service Manual User Manual
Page 68
SECTION 4 - CONTROL COMPONENTS
4-4
– JLG Lift –
3121228
Platform Junction Box - Install/Remove
All the platform mounted switches and controls connect to
the platform junction box before running to the Ground
Control Module (P2, P3, and P4 Connectors), the Ground
Control Module Harness is attached to the side of the
mast assembly.
Junction Box to Ground Control Harness -
Remove/Install
Platform Junction Box - Installation
1. Platform Junction Box
2. Junction Box Attach Screws
3. Platform Console Harness
Connector
4. Ground Control Module Har-
ness Connector
5. Platform Aux. # 2 Connec-
tor (Spare)
6. Platform Aux. #1 (Foot-
switch/Platform Gate Inter-
lock Connector)
7. Programmable Security
Lock (PSL) Connector
7
3
2
4
5
6
1
Junction Box to Ground Control Module Harness - Installation
1. Harness from Platform Junc-
tion Box to Ground Control
Module
2. Spring Tensioner Clamp
3. Power Trak Assembly
4. Platform Junction Box
5. Platform Junction Box to
Platform Control Harness
Note: See Figure 5-7., Section 5 - Mast Components for more
detailed harness hardware installation.