Platform junction box - install/remove – JLG 10MSP Service Manual User Manual

Page 68

Advertising
background image

SECTION 4 - CONTROL COMPONENTS

4-4

– JLG Lift –

3121228

Platform Junction Box - Install/Remove

All the platform mounted switches and controls connect to
the platform junction box before running to the Ground
Control Module (P2, P3, and P4 Connectors), the Ground
Control Module Harness is attached to the side of the
mast assembly.

Junction Box to Ground Control Harness -

Remove/Install

Platform Junction Box - Installation

1. Platform Junction Box
2. Junction Box Attach Screws
3. Platform Console Harness

Connector

4. Ground Control Module Har-

ness Connector

5. Platform Aux. # 2 Connec-

tor (Spare)

6. Platform Aux. #1 (Foot-

switch/Platform Gate Inter-
lock Connector)

7. Programmable Security

Lock (PSL) Connector

7

3

2

4

5

6

1

Junction Box to Ground Control Module Harness - Installation

1. Harness from Platform Junc-

tion Box to Ground Control
Module

2. Spring Tensioner Clamp
3. Power Trak Assembly

4. Platform Junction Box
5. Platform Junction Box to

Platform Control Harness

Note: See Figure 5-7., Section 5 - Mast Components for more

detailed harness hardware installation.