Battery installation - (4-6v batteries) (option), Front rear – JLG 10MSP Service Manual User Manual
Page 59

SECTION 3 - BASE COMPONENTS
3121228
– JLG Lift –
3-27
Battery Installation - (4-6V Batteries) (OPTION)
Battery Installation - 4-6V
(Left Side Batteries Shown with Machine Covers Removed)
1. Batteries (Left Side)
2. Battery Hold-Down Bra-
kets and Fasteners
3. Drive Motor Cover Screw
Bracket
4. Move Rear Battery For-
ward and Lift Out
NOTE: The carry deck, support frame will need to be removed to
remove the batteries. Once hold-down brackets (item 2)
are removed, remove the cables from the batteries. Slide
the rear battery forward to clear the bracket (item 3).
Then lift battery out of base frame.
1
2
3
4
1. Ground Control Module
2. Right Front Battery
3. Left Front Battery
4. 175 Amp Inline Fuse
5. Right Rear Battery
6. Left Rear Battery
7. Battery Quick-Disconnect
NOTE: Label battery cables before removing to ensure
proper installation.
All other connections to Ground Control Module
same as in Section 4 - Figure 4-2.
Figure 3-6. Battery Cable to Battery Termi-
nal Connections (4-6V)
FRONT
REAR
5
6
3
4
2
1
7