Battery installation - (4-6v batteries) (option), Front rear – JLG 10MSP Service Manual User Manual

Page 59

Advertising
background image

SECTION 3 - BASE COMPONENTS

3121228

– JLG Lift –

3-27

Battery Installation - (4-6V Batteries) (OPTION)

Battery Installation - 4-6V

(Left Side Batteries Shown with Machine Covers Removed)

1. Batteries (Left Side)
2. Battery Hold-Down Bra-

kets and Fasteners

3. Drive Motor Cover Screw

Bracket

4. Move Rear Battery For-

ward and Lift Out

NOTE: The carry deck, support frame will need to be removed to

remove the batteries. Once hold-down brackets (item 2)
are removed, remove the cables from the batteries. Slide
the rear battery forward to clear the bracket (item 3).
Then lift battery out of base frame.

1

2

3

4

1. Ground Control Module
2. Right Front Battery
3. Left Front Battery
4. 175 Amp Inline Fuse

5. Right Rear Battery
6. Left Rear Battery
7. Battery Quick-Disconnect

NOTE: Label battery cables before removing to ensure

proper installation.
All other connections to Ground Control Module
same as in Section 4 - Figure 4-2.

Figure 3-6. Battery Cable to Battery Termi-

nal Connections (4-6V)

FRONT

REAR

5

6

3

4

2

1

7

Advertising