Start-up, Fill the heating bath, Offsetting the heating bath – Heidolph Hei-VAP Precision User Manual

Page 13: Installing the heating bath

Advertising
background image

Set-up and Start-up

Set-up and Start-up

24

25

Avoid setting up the rotary evaporator in corrosive atmospheres.

This reduces the service life of the equipment.

CAUTION

Tilting the heating bath!

Damaging the housing and risk of injuries.

Place the basic unit on a solid level surface with sufficient room.

1. Place the base plate (2) on the surface for the heating bath (1) into the provided rail,

so that the heating bath cannot tilt.

2. Place the heating bath into the rails by its feet. Be careful that the heating bath

connection points to the right rear.

Fill the heating bath

The heating bath can be filled with various heat transfer fluids.

1. Select a liquid suitable for your application, such as tap water, water-soluble poly-

ethylene glycol or oil of a lower viscosity (40 cP) and flash point (observe the Safety

Data Sheet)> 260 °C.

2. Immerse the evaporator flask.

3. Fill the heating bath with the media of choice. The level should be within the

minimum and the maximum marking in the heating bath.

It will be necessary to expand the distance of the heating bath to the drive unit when

using large evaporator flasks or intermediate pieces between evaporator flasks and the

vapor tube, such as bump flasks or foam brake flasks.

Shift the heating bath including the base plate by the handle on the rail and position

accordingly (Figure 4-2).

Offsetting the heating bath

Do not use de-ionized or distilled water.

The minimum-/maximum specifications in the heating bath refer to the

liquid level when the evaporator flask is immersed.

Location of the heating bath

The base unit is located on a suitable surface. Verify that sufficient

space (approx. 20 cm around the evaporator) and a solid seating are

available in the shifting area.

Verify a solid seating of the heating bath base and the bath.

1

Heating bath

2

Base plate

Figure 4-2: Heating bath

Select a level, solid, and heat resistant surface.

Start-up

Installing the heating bath

The basic unit is located on a suitable place.

1

2

Advertising