Glassware sets, Heating bath set-up when using chiller, Assemble glassware sets – Heidolph Hei-VAP Precision User Manual

Page 14

Advertising
background image

Set-up and Start-up

Set-up and Start-up

26

27

1

Chiller

2

Chiller extension plate

1. Place the two screws on the right side of the extension plate of the Chiller. (Contact a

local Heidolph Distributor if using a previously purchased Chiller before July, 2009 for

proper attachments of the extension plate.

2. Check the extension plate (2) for proper seating.

Location of the heating bath when using Chiller

The base unit is located on a suitable surface. Verify that sufficient

space (approx. 20 cm around the evaporator) and a solid seating are

available in the shifting area and the Chiller.

Verify a solid seating of the heating bath base and the bath as well

as the Chiller extension.

Heating bath set-up when using Chiller

1

2

WARNING

Glass breakage!

Serious injuries from shattering and breaking glass.

Check glass devices for damages (stars, breaks, etc.).

Only use perfect glass devices and replace all damaged

glassware as soon as possible.

Work carefully.

Assembling the glassware sets will be described in the following. The rotary evaporators

can be equipped with various glassware sets.

The base unit is set up and installed.

A water or coolant connection is available (does not apply for glassware set G5).

Lift is in the top position (see chapter Set-up and start-up).

CAUTION

Unintentionally rotating drive!

Injuries to hands.

Verify that the rotation is displayed.

Glassware sets

Assemble glassware sets

Advertising