Instructions for Use V 2.9 RevC, English – 12/2013

4.

Instrument Setup

4.6.3 Fastening the wax bath connection cables (instruments with fume control system only)

Fig. 19

After having mounted and connected the wax baths, place the magnetic

clamps on the side wall of the housing so that the cables are fixed in a posi-

tion that ensures free movement of the fume containment shields.

• Mount the reagent

containers (1) (glass

or aluminum) onto the

station holders (2) of

the platform.

4.6.4 Installing the reagent stations

1

2

Instruments with fume control system are equipped with a Plexiglas

fume containment shield which consists of two parts. To ensure the

fume containment shields can be freely rotated and displaced as re-

quired without being obstructed by the wax bath connection cables,

two magnetic clamps are provided on each of the cables to attach

the cables to the housing.