Main power switch (i/o) – MTS Acumen User Manual
Page 44

System Load Cell
There are eight bolts associated with the load cell.
Four of the eight holes around the perimeter of the
load cell (see the photo on the right) are used for
mounting. The others are used to assemble the load
cell and should not be manipulated by the user. The
middle bolt hole is used to mount fixtures to the load
cell.
The following low-force load cells are optionally
provided. They do not contain an accelerometer and
are designed to be tandem-mounted, utilizing the
system cell's accelerometer for compensation.
•
500N load cell kit
•
250N load cell kit
•
125N load cell kit
Main Power Switch (I/O)
Controller Power
The main power switch for the controller is located on the back of the controller unit. Press position I to
turn the power on to the controller. Press position O to turn off power to the controller.
FlexTest Controller Power Switch
Load Frame Power
The main power switch for the MTS Acumen load frame is located on the back side of the load frame base.
Press position I to turn the power on to the load frame. When the power is on, the frame-mounted status
light on the front of the hood illuminates. Press position O to turn off power to the load frame.
Load Frame Power Switch
44 | MTS Acumen
™
System Introduction