Example Spring Test Procedure
Introduction
Setting up and running the Example Spring Test is an excellent way to become familiar with the MTS
Acumen system hardware and software. These instructions are based on the example MTS Acumen
system shown in the Introduction chapter. If your system differs, see the Key Concepts and Best Practices
for Other Tests and Configurations chapters for information on how to adapt the example test to your
particular system configuration.
Overview
The Example Spring Test procedure describes how to perform a compression test using the beige spring.
Major steps include:
1.
(p. 96)
2.
Position the Crosshead and Actuator for Initial Setup
(p. 98)
3.
(p. 102)
4.
(p. 107)
5.
(p. 113)
6.
(p. 117)
7.
(p. 121)
8.
Tune the System for the Specimen
(p. 124)
9.
(p. 131)
10.
(p. 138)
If you are unsure of the station's readiness for collecting valid data, be sure to perform the activities in the
(p. 145) before testing.
Power Up the Station
Important: Before you begin running tests, you should consider performing the
(p. 145). This procedure is recommended anytime you select a new station, change
parameter sets or sensor calibration files with the existing station, or question whether the station
is ready to collect valid data.
1. Turn on the computer and the controller.
96 | MTS Acumen
™
Running the Example Spring Test