MacDon Transport 25 ft 972 User Manual

Page 33

Advertising
background image

CONVERTING TO FIELD

Form # 131126

Issue 11/07

31

6. Remove split ring and remove lock pin from

hitch knee joint at (C).

7. Store hitch as follows: Place front section of

hitch on top of storage bracket (D) at right side

of walking beam. Fold hitch and place rear

section into notch in bottom of bracket (D).

Install pin from knee joint to lock the two

sections at (E) and secure with split ring.

8. Drop weight box off tractor linkage in a suitable,

level location. Fully retract header lift cylinders.

9. Slowly drive tractor forward so that lift linkage

enters header legs. Continue to drive slowly

forward until linkage contact support plate in the

lower header leg, and header nudges forward.

Stop engine, set park brake and remove key.

10. Connect center link to header at (F).

11. Connect driveline to header drive shaft.

12. Connect reel lift hose, draper drive hoses and

electrical harnesses from tractor to header at

left side.

13. Connect reel drive hoses from tractor to header

at right side.

14. Raise header fully.

NOTE: Steps 15 through 20 are for headers with

hay conditioner. For headers without hay

conditioner, go to Step 21.

15. Connect conditioner transfer chain (A) to right

side of conditioner.

C

REMOVE LOCK PIN FROM HITCH JOINT

D

E

HITCH STORAGE

ATTACH TRANSFER CHAIN

A

Advertising
This manual is related to the following products: