Terminators – Rockwell Automation 1770 DH,DHII,DH485 CABLE User Manual

Page 27

Advertising
background image

Planning a Data Highway or Data Highway Plus

Cable System

Chapter 2

2-11

Terminators

Figure 2.6 shows the terminators that must be installed in your DH or DH+
cable system if you use the 1770-XG connector kit. These terminators are
included in the 1770-XG connector kit. You must install two terminators
(one plug terminator and one jack terminator) for a complete DH or
DH+ network.

Figure 2.6

Two terminators must be installed for a complete DH or DH+ cable

system.

Plug Terminator

Jack Terminator

11608

Figure 2.7 illustrates how the terminators can be positioned in a DH or
DH+ network.

Figure 2.7

Typical placement of terminators in a DH or DH+ network.

PLC-2

Station

PLC-3

Station

Mini-PLC-2

Station

PLC

Station

Computer

Station

Dropline

Dropline

Dropline

Dropline

Dropline

Terminator

Terminator

Trunkline

T-Connectors

11605

Advertising