6 - constructing a data highway ii cable system, Chapter overview, Install the taps – Rockwell Automation 1770 DH,DHII,DH485 CABLE User Manual

Page 90: Constructing a data highway ii cable system

Advertising
background image

Chapter

6

6-1

Constructing a Data Highway II Cable System

In this chapter we explain how to construct a DH II cable system, including
how to:

install the taps

prepare the trunkline cable for installation

attach the trunkline cables and terminators to the tap

install the droplines

Important: Before you begin any procedure explained in this chapter, read
Chapter 5, ‘‘Planning a Data Highway II Cable System”
for important
guidelines and precautions to consider when installing your cable network.

The first step in constructing your DH II cable system is to install the taps.
When deciding where to mount the taps, follow these guidelines:

ATTENTION: Mount the tap so that the cap for the dropline jack
can hang from its chain freely without touching a conductive surface.
If the cap for the dropline jack or its chain touches a conductive
surface, the reliability of the link could be significantly reduced.

Make sure the mounting location is convenient for your trunkline

cable routing.

Make sure the mounting location does not cause the trunkline cable

bend-radius to be less than 6 inches (15.2 cm).

Mount the tap at least 2 inches (5.1 cm) from the interface module to make

sure the interface module has sufficient air flow for cooling.

Chapter Overview

Install the Taps

Advertising