Chapter 6 - ce thin client operating instructions, Chapter objectives, Starting up/powering on the terminal – Rockwell Automation 2727-G7P20D3Q7 MobileView G750 Guard Machine Terminal User Manual

Page 89: Chapter 6, Ce thin client operating instructions

Advertising
background image

1

Publication 2727-UM002D-EN-P

Chapter

6

CE Thin Client Operating Instructions

Chapter Objectives

This chapter provides instructions on how to:

• start up or power on the MobileView terminal
• start an auto launch sequence
• configure Ethernet network settings
• save registry settings
• start terminal services
• shut down or power off the MobileView terminal
• setting the date and time

Starting Up/Powering On
the Terminal

To start up or power on the MobileView terminal:

1. Attach the MobileView Connection Cable to the Junction Box

Cable as shown on page 3-4. Tighten threaded coupling until it
is finger tight.

2. Check the MobileView terminal for a start-up screen.

If the start-up screen does not appear, check the 24V dc power source
and cable connections at the Junction Box and MobileView terminal.

Advertising