Rockwell Automation 7000A PowerFlex Medium Voltage Drive (A-Frame) - Classic Control User Manual
Page 176
 
4-2
Commissioning
7000A-UM150F-EN-P – June 2013
7000 “A” Frame
13.
Apply medium voltage to the drive and perform operational
checks.
14.
Bump motor for rotation check and tune drive to the system
attributes. (If the load is unable to handle any movement in the 
reverse direction the load should be uncoupled prior to bumping 
the motor for directional testing). 
15.
Run the drive motor system throughout the operational range
to verify proper performance.
 
 
Please Note: Customer personnel will be required on-site to 
participate in the start-up of the system. 
 
 
Commissioning the Drive
 
 
Information contained in this chapter will assist in commissioning 
a PowerFlex air-cooled medium voltage AC drive. This chapter 
contains reference material with information including: 
• Recommended Tools and Equipment
• Safety Checks
• Drive line-up Data Sheets
• Pre-Power Checks
• Control Power Checks
 
 
Review the information contained in this chapter prior to 
commissioning the drive. It will be used as a reference while the 
drive line-up commissioning is performed. Record all the 
information requested in the data sheets. The information 
recorded on the data sheets will be useful during future 
maintenance and troubleshooting exercises. 
 
 
Perform the commissioning checks illustrated in this chapter in the 
sequence that they have been presented. Failure to do so may result 
in equipment failure or personal injury.