Shp red finished frame, Shp blue finished frame, Ssd red finished frame – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual

Page 113: Shp r, Shp b, Ssd r

Advertising
background image

B

P

ROCESS

P

LANS

107

• •

SHP R

ED

F

INISHED

F

RAME

SHP B

LUE

F

INISHED

F

RAME

SSD R

ED

F

INISHED

F

RAME

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Finish

SHP

Red Frame

Finish 0.11

0.155

SHP

Frame

required

20 Assemble

SHP Red
Frame

Subassembly 0.19 0.083 Labor

(1)

Place

in

inventory

10

Finish SHP
Red Frame

20

Assembly

SHP Red

Frame

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Finish

SHP

Blue Frame

Finish 0.11

0.155

SHP

Frame

required

20 Assemble

SHP Blue
Frame

Subassembly 0.19 0.083 Labor

(1)

Place

in

inventory

10

Finish SHP

Blue Frame

20

Assembly
SHP Blue

Frame

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Finish

SSD

Red Frame

Finish 0.11

0.155

SSD

Frame

required

20 Assemble

SSD Red
Frame

Subassembly

0.19

0.083

Labor (1)

Place in
inventory

10

Finish SSD
Red Frame

20

Assembly

SSD Red

Frame