The process plans for the seat assembly contain a single subassembly operation. In this
operation, the previously manufactured seat post and purchased seat are assembled. The
subassembly is then placed in inventory where it is available for demand from a final
assembly order. The component parts required for this subassembly are a seat post and
seat for each subassembly to be produced. The process plan for Seat Assembly is
summarized below.

Seat Assembly Plan

S

EAT

P

OST

The process plans for a seat post contain two operations: cut and machine. The completed
seat post is then placed in inventory to be used by orders for seat assemblies. The raw
materials required at the cut operation have not been included in the process plan as the
material-planning replenishment process at the MRP level assures that adequate materials
will be available. The process plan for Seat Post is summarized below.

Seat Post Plan

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Assemble

Seat and
Post

Subassembly

0.20

0.084

Labor (1)

Seat and Seat Post
required;
Place in inventory

10

ASSEMBLE

SEAT AND

POST

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Material

Consumed

Material

Produced

10 Cut

Seat

Post

Cut

0.17

0.068

20 Machine

Seat Post

Machine MM 0.130

Seat

Post

10

CUT SEAT

POST

20

MACHINE

SEAT POST