Neck post, Seat assembly, Seat post – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual

Page 116

Advertising
background image

F

ACTORY

T

ALK

S

CHEDULER

U

SER

S

G

UIDE

110

• •

N

ECK

P

OST

S

EAT

A

SSEMBLY

S

EAT

P

OST

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Cut

Neck

Post

Cut 0.21

0.065

20 Machine

Neck Post

Machine MM

0.120

30 Bend

Neck

Post

Bend BM

0.072

40 Finish

Neck

Post

Finish 0.14

0.074 Place

in

inventory

10

Cut Neck Post

20

Machine Neck

Post

30

Bend Neck

Post

40

Finish Neck

Post

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Assemble

Seat and
Post

Subassembly

0.20

0.084

Labor (1)

Seat and Seat Post
required
Place in inventory

10

Assemble

Seat and Post

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Cut

Seat

Post

Cut 0.17

0.068

20 Machine

Seat Post

Machine

MM

0.130

Place in inventory

10

Cut Seat Post

20

Machine Seat

Post

Advertising