Neck post, Seat assembly, Seat post – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual
Page 116

F
ACTORY
T
ALK
S
CHEDULER
U
SER
’
S
G
UIDE
110
• •
•
•
•
N
ECK
P
OST
S
EAT
A
SSEMBLY
S
EAT
P
OST
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Cut
Neck
Post
Cut 0.21
0.065
20 Machine
Neck Post
Machine MM
0.120
30 Bend
Neck
Post
Bend BM
0.072
40 Finish
Neck
Post
Finish 0.14
0.074 Place
in
inventory
10
Cut Neck Post
20
Machine Neck
Post
30
Bend Neck
Post
40
Finish Neck
Post
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Assemble
Seat and
Post
Subassembly
0.20
0.084
Labor (1)
Seat and Seat Post
required
Place in inventory
10
Assemble
Seat and Post
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Cut
Seat
Post
Cut 0.17
0.068
20 Machine
Seat Post
Machine
MM
0.130
Place in inventory
10
Cut Seat Post
20
Machine Seat
Post