Neck post – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual

Page 25

Advertising
background image

3

T

HE

F

ACTORY

O

VERVIEW

19

• •

adequate materials will be available. The process plan for Handlebar is summarized
below.

Handlebar Plan

N

ECK

P

OST

The process plans for a handlebar contain four operations: cut, machine, bend, and finish.
The completed neck post is then placed in inventory to be used by orders for handlebar
assemblies. The raw materials required at the cut operation have not been included in the
process plan as the material-planning replenishment process at the MRP level assures that
adequate materials will be available. The process plan for Neck Post is summarized below.

Neck Post Plan

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Cut

Handlebar
Tubing

Cut 0.16

0.055

20 Bend

Handlebar
Tubing

Bend BM

0.043

30 Finish

Handlebar

Finish

0.14

0.088

Place in inventory

10

CUT

HANDLEBAR

TUBING

20

BEND

HANDLEBAR

TUBING

30

FINISH

HANDLEBAR

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Cut

Neck

Post

Cut 0.21

0.065

20 Machine

Neck Post

Machine MM

0.120

30 Bend

Neck

Post

Bend BM

0.072

40 Finish

Neck

Post

Finish 0.14

0.074 Place

in

inventory

10

CUT NECK

POST

20

MACHINE

NECK POST

30

BEND NECK

POST

40

FINISH NECK

POST

Advertising