Ssd blue finished frame, Shp frame, Ssd b – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual
Page 114: Shp f
Advertising
F
ACTORY
T
ALK
S
CHEDULER
U
SER
’
S
G
UIDE
108
• •
•
•
•
SSD B
LUE
F
INISHED
F
RAME
SHP F
RAME
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Finish
SSD
Blue Frame
Finish 0.11
0.155
SSD
Frame
required
20 Assemble
SSD Blue
Frame
Subassembly
0.19
0.083
Labor (1)
Place in
inventory
10
Finish SSD
Blue Frame
20
Assembly
SSD Blue
Frame
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Cut SHP Frame
Tubing
Cut 0.36
0.12
20 Bend SHP Frame
Tubing
Bend BM
0.154
30 Machine
SHP
Frame Tubing
Machine MM
0.211
40 Weld SHP Frame
Weld
WD
0.234
Place in inventory
10
Cut SHP
Frame Tubing
20
Bend SHP
Frame Tubing
30
Machine SHP
Frame Tubing
40
Weld SHP
Frame