Summary – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual

Page 136

Advertising
background image

F

ACTORY

T

ALK

S

CHEDULER

U

SER

S

G

UIDE

130

• •

would want to attach the 2 By 5 Pool 3 time pattern to the Capacity selection of the Labor
resource and the 2 By 5 Machine time pattern to the Capacity selection of the remaining
resources. The Capacity selection for the Bender resource is shown below. You should
also note that the July 4 exception we created in the previous section is listed in the
Exceptions section of the Composite Editor window.

You can also enter exceptions in this editor by double-clicking in the grid section to open
the Exceptions window.

For our tutorial system, we defaulted on the Efficiency time patterns. If you wanted to
reduce one of your resources to an efficiency of 90%, you would simply attach the
Machine At 90 time pattern that we just created.

Summary

We have provided you with a brief overview on how to use the time pattern editors, which
should allow you to develop most of your application’s time patterns. There are other
features available that have not been covered here. If your schedule has special
requirements, we recommend that you take advantage of the online help files.

Advertising