Finished frame, Frame – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual

Page 23

Advertising
background image

3

T

HE

F

ACTORY

O

VERVIEW

17

• •

The components required before this operation can be started are the manufactured parts
SHP Red Finished Frame, Handlebar Assembly, and Seat Assembly and the purchased
parts Pedal and Chain Assembly, Wheels, Derailleur Assembly, and Brakes.

F

INISHED

F

RAME

The process plans for a finished frame (SHP Red, SHP Blue, SSD Red, and SSD Blue)
contain two operations. The frame parts are first finished (red or blue) and then the parts
are subassembled. The finished frame is then placed in inventory where it is available for
demand from a final assembly order. The process plan for SHP Red Finished Frame is
summarized below.

SHP Red Finished Frame Plan

F

RAME

The process plans for a frame (SHP or SSD) contain four operations: cut, bend, machine,
and weld. The frame is then placed in inventory to be used by orders for finished frames.
The raw materials required at both the cut and weld operations have not been included in the
process plan as the material-planning replenishment process at the MRP level assures that
adequate materials will be available. The process plan for SHP Frame is summarized next.

Seq

#

Operation

Work Cell

Setup

Time

Process

Time

Additional

Resources

Notes

10 Finish

SHP

Red Frame

Finish 0.11

0.155

SHP

Frame

required

20 Subassemble

SHP Frame

Subassembly

0.19

0.083

Labor (1)

Place in
inventory

10

FINISH

FRAME

20

ASSEMBLE

FRAME