Rockwell Automation FactoryTalk Scheduler Users Guide User Manual
Page 33

4
•
S
CHEDULING
F
EATURES
27
•
•
•
• •
as shown below. Although this operation time is six hours, this particular process spans a
nine-hour period because it’s paced by the labor availability.
Between 1
PM
and 3
PM
, there are two units of the resource available. Thus, the operation
is assumed to be at 100% efficiency during that time. However, between 3
PM
and 9
PM
,
there is only one unit of labor available. The operation will continue during this six-hour
period at 50% efficiency, which accounts for an additional three hours of operation time.
During the last hour of the operation, the efficiency returns to 100% because two labor
units are available.
The spanned operation time can also include periods when there are no units available,
resulting in a zero efficiency during that time. The total number of units requested must be
available when the operation starts. For example, if the operation could not begin until
4
PM
of Day 1, the start of the operation would have to be delayed until 9
PM
on Day 1 and
would finish at 11
AM
on Day 2, as shown below.
7
10
1
4
7
10
1
4
7
10
AM
PM
AM
7
10
1
4
7
10
1
4
7
10
AM
PM
AM