Rockwell Automation FactoryTalk Scheduler Users Guide User Manual

Page 33

Advertising
background image

4

S

CHEDULING

F

EATURES

27

• •

as shown below. Although this operation time is six hours, this particular process spans a
nine-hour period because it’s paced by the labor availability.

Between 1

PM

and 3

PM

, there are two units of the resource available. Thus, the operation

is assumed to be at 100% efficiency during that time. However, between 3

PM

and 9

PM

,

there is only one unit of labor available. The operation will continue during this six-hour
period at 50% efficiency, which accounts for an additional three hours of operation time.
During the last hour of the operation, the efficiency returns to 100% because two labor
units are available.

The spanned operation time can also include periods when there are no units available,
resulting in a zero efficiency during that time. The total number of units requested must be
available when the operation starts
. For example, if the operation could not begin until
4

PM

of Day 1, the start of the operation would have to be delayed until 9

PM

on Day 1 and

would finish at 11

AM

on Day 2, as shown below.

7

10

1

4

7

10

1

4

7

10

AM

PM

AM

7

10

1

4

7

10

1

4

7

10

AM

PM

AM