Purchased components – Rockwell Automation FactoryTalk Scheduler Users Guide User Manual
Page 27

3
•
T
HE
F
ACTORY
O
VERVIEW
21
•
•
•
• •
Purchased components
In addition to the manufactured components, we also have purchased components that are
used in the assembly operations. Purchase orders for these components are automatically
generated by the MRP (based on the economic lot size and lead times) to meet the
manufacturing demands. The following table summarizes the purchased components for
this same sample ten-day production period.
Material Name
Quantity
Date
Pedal and Chain Assembly
60
6/10/02 6:00 PM
Pedal and Chain Assembly
60
6/13/02 6:00 PM
Pedal and Chain Assembly
60
6/19/02 6:00 PM
Brakes
75
6/12/02 6:00 PM
Brakes
75
6/18/02 6:00 PM
Wheels
48
6/12/02 6:00 PM
Wheels
48
6/17/02 6:00 PM
Wheels
48
6/19/02 6:00 PM
Derailleur Assembly
60
6/12/02 6:00 PM
Derailleur Assembly
60
6/17/02 6:00 PM
Derailleur Assembly
60
6/20/02 6:00 PM
Seat
100
6/10/02 6:00 PM