Connect auger tubes – Wheatheart X160 Series User Manual

Page 40

Advertising
background image

3. A

SSEMBLY

W

HEATHEART

- G

RAIN

A

UGERS

X160-85, X160-105, X160-125

40

30875 R0

3.2.2. C

ONNECT

A

UGER

T

UBES

Important:

Always strap tubes to the support stands to prevent the tubes from rolling off the

stands.

Note:

Assemble the auger tube starting with the discharge section and working toward

the intake section.
1. Bolt tube sections together (see Figure 3.5 for details), working from the

spout end (upper tube) toward the discharge end (lower tube):

a. Align flightings to ensure a continual spiral of auger surface, and connect

flight shafts with 5/8” x 4-1/2” bolts and 5/8” locknuts.

b. As flight shafts are connected, slide tube sections together and secure with

eleven 5/8” x 1-1/2” GR8 bolts and 5/8” locknuts. Use three 5/8” x 3” GR8

bolts and locknuts for the flange section where the two sections of tube

track meet (see Figure 3.4), or a single 5/8” x 2-1/2” GR8 bolt where tube

track meets a flanged section without a tube track (see Figure 3.5).

Figure 3.4 Track-to-Track Tube Section Connections

Table 3.2 Connecting Auger Tube Sections and Flights

Diagram #

Description

Part #

Tube Connection

(Track-to-Track)

Tube Connection
(Track-to-Flange)

1

5/8” x 4-1/2” bolt

18545

1

1

2

5/8” x 1-1/2” bolt

19590

11

11

3

5/8” x 3” bolt

21463

3

0

4

5/8” x 2-1/2” bolt

27589

0

1

5

5/8” nut

19600

15

13

1

2

3

5

5

5

USE A STRAIGHT-EDGE

TO ALIGN TRACKS TO ENSURE

A SMOOTH PATH FOR THE

TRACK SHOE

Advertising