Wheatheart X160 Series User Manual

Page 44

Advertising
background image

3. A

SSEMBLY

W

HEATHEART

- G

RAIN

A

UGERS

X160-85, X160-105, X160-125

44

30875 R0

I

NSTALL

THE

X160-105/125 H

YDRAULIC

L

IFT

C

YLINDERS

1. Identify the tube section where the hydraulic lift cylinders install, and note the

location of the tube cylinder mounts.

2. Ensure that the tube cylinder mounts are facing down.
3. Fasten two rear cylinder attach brackets to the rear cylinder mounts with eight

5/8” x 2” GR8 bolts and locknuts.

4. Loosely fasten the two front cylinder attach brackets and half clamps to the

front of the cylinders with eight

1/2” x 1-3/4”

bolts and locknuts (see Figure 3.7

below).

Figure 3.7 Installing Front Cylinder Attach Brackets

5. Slide the cylinder rod guide onto the end of the track closest to where the lift

cylinders install.

Note:

The hydraulic lift cylinders must be positioned with the rod end towards the

discharge end of auger.
6. For each hydraulic cylinder:

a. Use forklift to lift the rear end of the cylinder and position it at a rear

cylinder attach bracket. Insert a hydraulic cylinder pin into the hole, and

secure with a 7/16” x 3-1/2” bolt and locknut. Tighten securely.

b. Use the forklift to lift and support the front end of the cylinder in place on a

front cylinder mount, and adjust the front cylinder attach bracket and half

clamp to align with the bolt boles in the front cylinder mounts.

c. Fasten the front cylinder attach bracket to the front cylinder mount using

four 5/8” x 2” bolts and locknuts.

d. Tighten the four 1/2” x 1-3/4” bolts and locknuts that fasten the cylinder

attach bracket and half clamp together.

6. Slide the cylinder rod guide toward the lift cylinders until the rod ends pass

through the two holes provided on the cylinder ram guide, and then secure

with a 1/2” X 1-1/2” bolt and a 1/2” locknut to prevent separation of rods and

cylinder arm guide.

13

12

Advertising