Wheatheart X160 Series User Manual

Page 85

Advertising
background image

W

HEATHEART

- G

RAIN

A

UGERS

3. A

SSEMBLY

X160-85, X160-105, X160-125

30875 R0

85

Figure 3.39 Secure Bushing Support and Connect Transition Flight

7. Raise and support the hopper tube spout head on a stand about 50” high.
8. Open the service door on the transition, then bring the intake hopper and

transition together guiding the transition flight shaft into the u-joint (Figure

3.40).

9. Attach the transition to the intake hopper with two 5/8” x 2” bolts and 5/8”

locknuts. Tighten to a slightly loose fit only as these bolts act as pivot points

(Figure 3.40), then close and secure the service door. DO NOT over-tighten.